Mäkilehto

Framing:

The floor system is made up of 16" deep 2"x4" pre-engineered and pre-manufactured floor trusses. The exterior walls are SIPs - Structural Insulated Panels. Each panel consists of 7/16" of OSB (Oriented Strand Board - a type of plywood) a 5 5/8" layer of polystyrene insulation and another layer of 7/16" OSB. The doors and windows have been precut from the panels.

At this point, we're a bit frustrated. Weather, which was so good for so long, has turned wet on us and we're only getting 1-2 days of progress a week.

November 2: Planks have arrived and are in place. To see a movie of a plank being placed, click on the image. The movie is approx. 5 Meg and is a windows format file.

November 4: Weather has been good and progress has been made. The rest of the wall and roof panels have arrived, as have the floor trusses for the 2nd floor.

Framing Progress II

Framing Progress III

Framing Progress IV