| Mäkilehto | ||||||
|
Framing 38 A view of all of the panels staged in place. The remaining lumber is on the ground, ready for use in the erection of the panels. Theoretically, the wall panels should go up in about 2 days, with the roof taking about 3 days. IF (and it's a big IF) the weather holds, we should have a roof mostly in place by Friday. All of the material has been removed from the street. This should make the city, and our future neighbors, happy. I know I feel better. |
![]() |
|||||
| << Previous | HOME | Next >> |
Last updated: |
Mäkilehto | New Residence | Copyright 2004-2005 |